• Welcome
  • About
  • The Warehouse
  • The Riverfront
  • Galleries
  • News & Events
  • Links

Mecklenburg Tobacco Warehouse Completed Preservation Initiatives

2002 Clean-up and Emergency Stabilization (Corporation of Shepherdstown) $10,800
2005 Repair and paint roof $6,075
2006 Manufacture and install window shutters $1,168
Structural engineering analysis $1,000
2007 Stonework repair and repointing $27,843
Stonework repair and repointing $6,250
2010 Historic Structures Report   $3,000
2011 Demolition of interior walls and flooring $6,250
2012 Demolition of bearing beams, disposal of interior debris and pipe fittings,  installation of exterior door $5,000
Repair and repointing of corbelled brick roof eaves $2,640
Excavate and repoint riverfront and west walls, and install French drain and drainage stone $5,000
Expenditures to date:
Corporation of Shepherdstown $10,800
Friends of Shepherdstown Riverfront, Inc. $64,226
News & Events
April 9, 2015

Goodbye – Friends of Shepherdstown Riverfront Disbanded

August 25, 2014

Tank/Piping Removal Work Complete!

August 25, 2014

Steel Tank and Piping Removal Underway

July 11, 2013

Historic Waterworks Report Available

May 9, 2013

Warehouse Open House May 18, 2013

Image Galleries

 

Reports

Historic Structure Report for the Mecklenburg Tobacco Warehouse - PDF
Waterworks at the Mecklenburg Tobacco Warehouse - PDF

Video

Copyright © 2018 Friends of the Shepherdstown Riverfront :: archived by Historic Shepherdstown & Museum

Scroll to top

Notifications