Mecklenburg Tobacco Warehouse Completed Preservation Initiatives
| 2002 | Clean-up and Emergency Stabilization (Corporation of Shepherdstown) | $10,800 |
| 2005 | Repair and paint roof | $6,075 |
| 2006 | Manufacture and install window shutters | $1,168 |
| Structural engineering analysis | $1,000 | |
| 2007 | Stonework repair and repointing | $27,843 |
| Stonework repair and repointing | $6,250 | |
| 2010 | Historic Structures Report | $3,000 |
| 2011 | Demolition of interior walls and flooring | $6,250 |
| 2012 | Demolition of bearing beams, disposal of interior debris and pipe fittings, installation of exterior door | $5,000 |
| Repair and repointing of corbelled brick roof eaves | $2,640 | |
| Excavate and repoint riverfront and west walls, and install French drain and drainage stone | $5,000 | |
| Expenditures to date: | ||
| Corporation of Shepherdstown | $10,800 | |
| Friends of Shepherdstown Riverfront, Inc. | $64,226 |
Image Galleries
Video
Copyright © 2018 Friends of the Shepherdstown Riverfront :: archived by Historic Shepherdstown & Museum




